Brief Description about the installion of the track rocket:

1.Determine the installation location, mark the hole.

First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation

2.Punch holes in each of the two marked positions,Insert the expansion screw protective sleeve into the hole of the wall.

First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation

3.Remove the track terminal box lid.

First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation

4.Follow the wiring diagram for wiring.

First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation

5.Put back the terminal box lid(note: remove the knock hole), arrange the wire into the groove of the track for mounting and securing.

6.Place the track against the wall and screw the track to the wall at the hole position.

7.Install the module to finish the installation.

Track reference picture:

First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation

First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation First generation track socket (right incoming line) 25A  Right incoming line with 25A switch and 70CM switch for exposed and concealed installation

FAQ:

1.Could i put my own logo on it?

Sure,We accept OEM.

2.How long is production time?

Based on the quantities, sample order 7-15 days,mass order 30-60days.

3. How can we guarantee quality?

We will prepare a pre-production sample before mass production;
We will final Inspection before shipment;

4.Do you provide sample?

Yes, we can provide the sample if we have ready the parts in stock, but the customers have to pay the sample cost.

5.Do you have ability for OEM cooperation?

OEM cooperation is welcomed, and we have experiences about them.